2000kw Francis Turbine Generator Power

Francis Turbine Generator
January 04, 2026
Category Connection: Francis Turbine Generator
Brief: See how this 2000kW Francis Turbine Generator brings practical value to hydroelectric power generation. This video showcases the automatic control system in action, demonstrates the robust construction using high-strength steel and alloys, and provides insights into its efficient energy conversion process for sustainable power production.
Related Product Features:
  • Features a robust Francis runner constructed from high-strength steel and alloys for exceptional durability.
  • Delivers a substantial unit capacity of 2000 kW, suitable for medium to large-scale hydroelectric power plants.
  • Incorporates an advanced automation control system for precise regulation and dynamic adaptation to water flow.
  • Provides stable and efficient power output through its 3-phase generator design.
  • Offers long-term reliability with an impressive lifespan ranging from 30 to 50 years.
  • Designed with a pipe diameter range of DN2250-3200mm to optimize water flow utilization.
  • Available in variants including Francis Steam Turbine Generator and Francis Hydraulic Turbine Generator.
  • Ensures operational safety and minimal downtime through its sophisticated automatic control mode.
FAQs:
  • What is the unit capacity and typical application of this Francis Turbine Generator?
    This Francis Turbine Generator has a unit capacity of 2000 kW and is ideally suited for medium to large-scale hydroelectric power plants, harnessing water energy from rivers, reservoirs, and dams for renewable electricity production.
  • What materials are used in the construction and what is the expected lifespan?
    The turbine generator is constructed from high-strength steel and alloys, chosen for their durability and corrosion resistance, ensuring a long operational lifespan of 30 to 50 years.
  • How does the automatic control system enhance operational efficiency?
    The advanced automation control system allows for precise regulation of turbine speed and output power, dynamically adapting to changes in water flow and electrical demand for smooth operation and maximum energy output.
  • What are the payment and delivery terms for this product?
    Payment can be made via T/T (Telegraphic Transfer) or Letter of Credit (LC), with a standard delivery time of 120 days and packaging in protective wooden cases with plastic film.