Place of Origin:
china
Brand Name:
DSSD
Certification:
iso,tuv
Model Number:
francis turbine
Contact Us
Francis Turbine 2000kw/Francis Turbina Low Head/Francis Hydropower Plant Mini
1). Francis turbine has the advantages of compact structure, high efficiency and can adapt to a wide range of water head of turbine type. It is one of the widely used around the world;
2). When the water flow through the turbine wheel, it enters to radial, axial flow, so it is also called the radial axial flow turbine;
3). Francis turbine is also called the Francis turbine. The water flow from the surrounding radial inflow runner, then approximate axial flow runner, runner by the crown, under the ring and the blade;
4). It is applicable to the head from a range of 20 meters of up to 700 meters, has the advantages of simple structure, stable operation, and high efficiency, but it is generally used in the head in the range(50 to 400 meters). Single output from tens of KW to several 101000 tile. At present this kind of turbine maximum output has exceeded 700000 kilowatts. A turbine is one of the most extensively used.
2. Product Details
Water Head |
25m-300m |
Runner Diameters |
0.45m-5m |
Power Range |
100KW to 70MW |
Frequency |
50HZ/60HZ |
Generator Voltage |
400V, 800V, 6300V, 10500V |
Layout pattern |
Horizontal or Vertical |
Material(blades) |
Stainless Steel ZG0Cr13Ni4Mo |
Excitation |
Brushless Or Static Excitation System |
Generator Insulation | F/F |
Lifespan |
30~50 years |
Manufacturer |
Deyang Dongsen Hydropower Equipment Co., Ltd. |
3. Application case
01. francis turbine 2*2000kw
02. francis turbine 3*630kw
This belongs to customized products. We could design products according to your requirement. All of our products are strictly designed and manufactured under ISO9001 quality management system and TUV, BV.
our factory
4. Our advantages
1). DSSD has senior engineering and technical experts, professional hydro-generator design team and installation team
2). Provide complete proposal for hydro power plant from water to wire
3). Abundant foreign power plant project implementation experience
Send your inquiry directly to us